Overview
In the last year we have worked closely with Bauer Media on an in-house project.
All 12 floors of the Park St facility was different therefore it required relocation, churns, rubbish removal, IT disconnect, reconnect and make good. Most of the work was conducted after hours, that allowed the business to operate as normal. As with any projects there were issues but through a great working relationship with the project team from Bauer Media we adapted and met all requirements in a timely manner.
The Bauer team have had nothing but praise for the work that was done. This is due to a great camaraderie and culture we have built here at Bramley.
Key take outs
5000
Desks Moved
50
Trucks Filled
80
Staff Required
5
Days Work
John Smith - Manager
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Fusce nec rutrum mauris. Mauris vitae velit nunc. Nullam molestie est ut tellus porttitor rhoncus. Vivamus non felis ac ante cursus luctus. Morbi non libero vel libero dapibus